News
1/7/2010 | Re-audit of Integrated Management System
On Friday 25 June, 2010 re-audits of the Quality Management System as per ISO 9001, Environment Management System as per ISO 14001, and Safety Management System as per OHSAS 18001 were successfully finished... read more
16/6/2010 | INDIAN AMBASSADOR´ S VISIT TO ČKD BLANSKO ENGINEERING, a.s.
On 18 May, 2010 we were favored with a visit of H.E. Ambassador of India to the Czech Republic, Mr Dinkar Prakash Srivastava. At the beginning of the visit, members of the company group of CIMOS – LITOSTROJ POWER d.o.o. and ČKD ... read more
14/6/2010 | The XXXII. Days of Large Dams 2010
On 8 – 10 June, 2010, an international conference The XXXII. Days of Large Dams 2010 was held in Banská Bystrica, Slovakia, under the auspices of the Ministry of Environment of the Slovak Republic and with support of Internationa... read more
4/6/2010 | Overhaul of TG3 turboset at HPP Slapy
At the beginning of May 2010 our company ČKD Blansko Engineering, a.s. concluded a contract for the overhaul of TG3 turboset at the HPP Slapy. This is another project which will be executed for our important client, the company Č... read more
31/5/2010 | CHOKKA RAO GODAVARI LIFT IRRIGATION SYSTEM, PHASE III, Extension of pump station GANGARAM - Stage 1, 2, and 3
On 5 May, 2010 the company ČKD Blansko Engineering, a.s. signed another contract for engineering services, i. e. hydraulic design, model fabrication, model tests, project outline and detail design documentation as wel... read more
28/5/2010 | PSPP Markersbach – Lower and upper reservoir volume extension
At the end of May 2010 we obtained, based on our bid, an order from our German client company Vattenfall Europe Generation AG of pressure fluctuation computation, demonstration of safety and operational reliability of... read more