Chrami – GES 2 (Georgia) - repair of spherical valve pumping set control system

On 9 December, 2009 a contract was signed for HPP Chrami – GES 2 rehabilitation in Georgia.
The work will be handed over to the client before end of September 2010.

print Back to news list