PSHPP Žarnowiec, Poland

TG 3 modernization and overhaul

In March 2009 all equipment was dispatched, which was supplied by the ČKD Blansko Engineering, a.s. for the turboset TG3 modernization and overhaul at the PSHPP Žarnowiec. The equipment was delivered to the PSHPP Žarnowiec about 1 month before the contractual delivery term. 

At present the turboset TG3 is erected under the ČKD Blansko Engineering,a .s. Erection Department employees´coordination and supervision.  

print Back to news list